Next Phase Electric is a licensed and insured electrical contractor in Covington, WA, installing generator interlock kits, inlet boxes and transfer switches across South King and Pierce County.
Three things set most of the price: the panel, the inlet size and how far the inlet is from the panel.
Book online
Enter your ZIP code. If we serve it, you pick the service and a time. It takes about a minute.
These six things decide the size of the job.
An interlock kit with an inlet box costs the least. A manual transfer switch costs more. An automatic switch for a standby generator costs the most.
An interlock has to be made for your panel model. A panel with no interlock made for it gets a manual transfer switch.
A 30-amp inlet suits generators up to about 7,500 watts. Larger generators need a 50-amp inlet and heavier wire.
The inlet goes on an outside wall. The farther it is from the panel, the longer the run.
A manual transfer switch is wired to six to ten chosen circuits. More circuits means a larger switch.
Federal Pacific and Zinsco panels have no interlock made for them, and they should be replaced first.
One flat price for the whole job.
The interlock kit or transfer switch
The inlet box on the outside wall
Electrical permit and inspection
A test run on your generator with the main locked out
Labeled breakers
You get the exact price first and approve it before any work starts.
The exact price comes upfront. You approve it before any work starts.
Online or by phone. A technician reaches out within 1 business hour.
Tell us the wattage and plug type of the generator and send a photo of the panel. We confirm the kit and give you the exact price.
Most installs take half a day. We run the house on your generator before we finish.
It depends on the panel, the inlet size and how far the inlet is from the panel. You get the exact price after we see the panel, before any work starts.
An interlock kit with an inlet box. It uses the panel you already have, lets you run any circuit, and makes backfeeding the utility impossible. A manual transfer switch costs more and limits you to the circuits wired into it.
Yes. An interlock uses the panel you already have. A manual transfer switch is a second box beside the panel, wired to six to ten chosen circuits.
A little. It uses heavier wire and a larger breaker. Match the inlet to the biggest 240-volt outlet on the generator.
No. An interlock has to be made for that panel model. Most Square D, Eaton, Siemens and GE panels have one. Federal Pacific and Zinsco panels do not, and those should be replaced anyway. We check yours from a photo.
Yes. It is new wiring at the panel and it gets inspected. The electrical permit is included, and we meet the inspector.
Licensed electricians across South King and Pierce County. Exact price before any work starts.