Next Phase Electric is a licensed and insured electrical contractor in Covington, WA, providing EV charger installation across South King and Pierce County.
Charge at home, full battery every morning. Level 2 chargers on dedicated 240V circuits. Permits included.
Book online
Enter your ZIP code. If we serve it, you pick the service and a time. It takes about a minute.
Every major brand. Panel to plug.
Up to 48A — the fastest home charging for a Tesla. We run the 60A circuit, mount the unit, and set up Wi-Fi so you can monitor from the app.
J1772 works with every non-Tesla EV (Tesla with adapter). ChargePoint, Grizzl-E, JuiceBox, Emporia — your pick.
Every Level 2 charger needs a dedicated 240V circuit. We size the wire, set the breaker, and run it clean — garage, exterior wall, or carport.
No garage? No problem. NEMA 4X enclosures, protected conduit, GFCI. Built for Covington weather.
A 120V outlet barely sips. Level 2 changes everything.
25–44 miles of range per hour vs. 3–5 on a regular outlet. Full battery by morning.
Plug in at night, full by morning. No more public charger waits.
Buyers like move-in EV ready. A real selling point in Covington.
A real 240V circuit beats extension cords. No tripped breakers, no fire risk.
Schedule charging for off-peak rates. Lower bill every month.
Adding a second EV later? Selling to an EV buyer? Ready either way.
Mounted near where you park, on its own 240-volt circuit, with the cable kept off the floor.
Consultation to charging. Three steps.
We check panel capacity, run distance, and panel upgrade needs. Upfront quote.
Permits, circuit, mount, test. Most done in a day.
Walkthrough, app setup, first-charge confirmation.
EV chargers are real electrical work. We know the codes, pull the permits, and do it right.
All permits and inspections handled. Zero paperwork on your end.
Licensed, insured, EV-experienced. No subcontractors.
Full cost after assessment — wiring, breaker, mount, permit, labor. No surprises.
Panel can't take a 240V circuit? We do the upgrade too. One team, one project.
A regular outlet is enough only for short daily drives. A 120-volt outlet adds about 5 miles of range an hour, while a Level 2 charger on a 240-volt circuit adds about 25 to 44. If you drive more than about 40 miles a day, or want a full battery every morning, Level 2 is the better fit.
J1772 works with every EV (Tesla with adapter). Tesla Wall Connector now uses NACS — adopted by most makers. We'll help you pick.
The right circuit depends on how fast your car can charge and what your panel can spare. A 40-amp circuit delivers 32 amps, about 7.6 kilowatts, and a 60-amp circuit delivers 48 amps, about 11.5 kilowatts. Some cars cannot use the higher rate, so we check the car before sizing the circuit.
Hardwired suits most daily charging, with no outlet to wear out and a higher charging rate. A plug-in charger on a NEMA 14-50 outlet is easy to take with you when you move, but the outlet has to be a heavy-duty one with GFCI protection. We install both.
Either way. We can supply popular models or install one you bought. Tell us the make/model and we'll confirm compatibility.
Yes. The simple way is a separate circuit for each charger. If the panel cannot spare that, two chargers can share one circuit through an energy management system that splits the power between the cars. Mention a second car when you book, so we size the first circuit with it in mind.
Generally no. Washington law bars associations from prohibiting or unreasonably restricting a charger at your own parking space. In a single-family community they usually cannot require approval unless the charger touches common areas or common power. Condo associations can ask for an application, which counts as approved if not denied in writing within 60 days.
Depends on your panel. 200A panels often have room for a 40A or 60A circuit. 100A panels usually need an upgrade. We'll check during the site visit.
Sometimes, yes. A load calculation may show that a smaller circuit is enough, since most cars charge overnight when the house is quiet. A load-management device can also pause charging when the house needs more power. If neither works, a subpanel or a panel upgrade is the fix, and we do those too.
Yes. A charger on a new 240-volt circuit needs an electrical permit and an inspection. Washington L&I issues the permit in most of our area, while Burien, Des Moines, Federal Way, Renton, SeaTac, Seattle and Tukwila run their own programs and Tacoma Power covers the addresses it serves. We pull the permit and handle the inspection.
Three things set the price: how far the panel is from where you park, whether the panel has room, and the size of the circuit. The exact price covers the wiring, breaker, mounting, permit and labor. You get it before any work starts, and you approve it first. See what sets the price.
4–8 hours, same day for most installs. Add a panel upgrade and it's a full day. We'll give you a clear window upfront.
Yes. Outdoor-rated chargers with weatherproof enclosures and protected conduit. Driveway, carport, or exterior wall — all safe and code-compliant.
Yes, with outdoor-rated equipment. Home chargers built for outdoor use are sealed against rain, and the car and charger check the connection before power flows. For Western Washington weather we use weatherproof enclosures, protected conduit and GFCI protection.
Next Phase Electric installs Tesla Wall Connectors and J1772 chargers in Maple Valley, Bonney Lake and nearby cities, each on a dedicated 240-volt circuit with the permit handled. We are licensed and insured, and most installs finish in a day.
Free assessment, upfront quote. Most homes charging in a day.
Protect the charger and the car plugged into it.
Learn moreWhen 100 amps is not enough for a charger.
Learn moreA 240 V outlet for a plug-in charger.
Learn moreBreaker Replacement · Generator Installation · Electrical Repair · Smart Home Devices · All services
EV charger installation by city: Kent · Covington · Auburn · Federal Way · Tacoma